You don't have javascript enabled. Good luck with that.
Pencarian
 SDA Kecamatan Senen Perbaiki Plat Ambles

Manhole Cover on Jalan Pasar Senen Repaired

Central Jakarta Bina Marga Sub-dept. is repairing a manhole cover of the water channel on Jalan Pasar Senen that collapsed up to six meters.

Currently six officers began to repair the channel

Muhammad Rohman, Executing Unit Head of Senen Sub-district Water Resources justified the water channel on Jalan Pasar Senen was collapsed up to 6 meters on Saturday (2/24) due to heavy equipment load.

25 Manhole Covers of IPAL in Pramuka Island Replaced

"Besides that, the channel's sheet pile was also collapsed. Currently six officers began to repair the channel," said Muhammad Rochman, Executing Unit Head of Bina Marga, Senen Sub-district, Monday (2/26).

The channel work is including sheet pile repair and manhole cover installation. The repair itself is predicted to be completed within a week.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye801 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye539 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye514 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye425 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye422 personAnita Karyati